£122.50? I don't think so...
So here's my current 'temporary' Internet speed
I can have a (Not)BT line installed, it will cost me £122.50 and it will be installed on the 8th January 2010. I don't think so. I'm not waiting nearly a month and then paying over a ton for a "switch on". I can feel a complaint letter coming on, over 3 weeks before the engineer has even installed the line. You've got to hand it to (Not)BT - They are geniuses at being absolutely and utterly terrible in every single respect.
